I dug right in and the first, and simplest to finish was the base for the Tie Predator. You see a finale post about that one shortly.
The next one was the cone shape that was seen in Pitch Black when the Marauders first came out of the ground when the eclipse started. That one a day later was still not dry, and was left on the radiator to dry out completely.
But the other two were dry and got their coats of paint. These two will also have water features. The one that will be the base for the Kappa, I decided to build a frame around the foam -
You can also see on one of the mounds (rocks) that there is a bit of gray. despite measuring twice I still goofed it up and needed to expand the rock with some Aves, to give the Kappa a enough room to squat.
Here's where we are with them at the end of the day. Thanks for looking.
No comments:
Post a Comment